Bunny R Lobsterboat. Engine Beds installed.
Hello everyone,
My brother was down in Port Sorell last weekend and took some more
pictures of the progress on our Lobsterboat. My father has just about
finished installing the engine beds, so very soon the Engine its self
will be fitted. Before that can happen, all the bare wood in the
space occupied by the engine will have to be properly finished. By
that I mean, faired with epoxy filler, sanded, epoxy saturated and
painted, otherwise these jobs would be very difficult with the engine
in place! That's the reason behind the partial ribs that have been
fitted and epoxied in place!. That would have been an extremely
difficult, if not impossible job to do when the engine was fitted!
The pictures are in the files section of Bolger6 in the
folder "Tyson's Bunny R Lobsterboat"
http://groups.yahoo.com/group/bolger6/files/
I've just been through the pictures and arrangened them
chronologically. The oldest are at the top of the page,
starting....obviously at 01..thru to 48. All the newest pictures will
be at the bottom of the page from now on! The newest pictures start
at: # 44 (Feb.20.2006)
Hugo Tyson, Launceston, Tasmania, Australia.
SPONSORED LINKS
Commercial building design Home building design Building design Building design software Steel building design Home building design plan
---------------------------------
YAHOO! GROUPS LINKS
Visit your group "bolger6" on the web.
To unsubscribe from this group, send an email to:
bolger6-unsubscribe@yahoogroups.com
Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.
---------------------------------
---------------------------------
Do you Yahoo!?
Messenger 7.0: Free worldwide PC to PC calls
[Non-text portions of this message have been removed]
My brother was down in Port Sorell last weekend and took some more
pictures of the progress on our Lobsterboat. My father has just about
finished installing the engine beds, so very soon the Engine its self
will be fitted. Before that can happen, all the bare wood in the
space occupied by the engine will have to be properly finished. By
that I mean, faired with epoxy filler, sanded, epoxy saturated and
painted, otherwise these jobs would be very difficult with the engine
in place! That's the reason behind the partial ribs that have been
fitted and epoxied in place!. That would have been an extremely
difficult, if not impossible job to do when the engine was fitted!
The pictures are in the files section of Bolger6 in the
folder "Tyson's Bunny R Lobsterboat"
http://groups.yahoo.com/group/bolger6/files/
I've just been through the pictures and arrangened them
chronologically. The oldest are at the top of the page,
starting....obviously at 01..thru to 48. All the newest pictures will
be at the bottom of the page from now on! The newest pictures start
at: # 44 (Feb.20.2006)
Hugo Tyson, Launceston, Tasmania, Australia.
SPONSORED LINKS
Commercial building design Home building design Building design Building design software Steel building design Home building design plan
---------------------------------
YAHOO! GROUPS LINKS
Visit your group "bolger6" on the web.
To unsubscribe from this group, send an email to:
bolger6-unsubscribe@yahoogroups.com
Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.
---------------------------------
---------------------------------
Do you Yahoo!?
Messenger 7.0: Free worldwide PC to PC calls
[Non-text portions of this message have been removed]