Jim Michalak's Boat Designs
118 E Randall, Lebanon, IL 62254
A page of boat designs and essays.
(15mar08)In this issue we'll rerun the important essay on rigging a lugsail. In the 1April issue I hope to show a fin propulsion system in a Roar2.
THE BOOK IS OUT!
BOATBUILDING FOR BEGINNERS (AND BEYOND)
is out now, written by me and edited by Garth Battista of Breakaway Books. You might find it at your bookstore. If not check it out at the....ON LINE CATALOG OF MY PLANS...
...which can now be found at Duckworks Magazine. You order with a shopping cart set up and pay with credit cards or by Paypal. Then Duckworks sends me an email about the order and then I send the plans right from me to you.
Left:
Rene Vidmer's nice AF4B project underway and he has never asked me about its headroom.
|
|
|
|
Rigging A Lugsail
BASIC BALANCE....
This applies to any sort of sail rig. For proper sailing the sail rig forces need to balance around the hull forces.
Look closely at Figure1 and see that the center of the sail area is placed right above the center of the leeboard's area. For boats like mine with shallow underbodies and deep narrow boards this is the way it has to be. You can't tinker very much with this if at all.
Here is what happens. In general you can think of the force of the wind as a giant finger pushing at the sail's center. Opposing that force is a giant finger pointing the other way at the center of the leeboard. The hull tends to rotate about that deep narrow board. So if those two forces are in vertical line the boat will not try to rotate and will in general maintain its heading.
If the center of sail area is moved aft of the leeboard, the boat will rotate into the wind if left on its own. To keep the boat on course the skipper needs to tug on the tiller as shown in the top of Figure 2. This is called "weather helm". Weather helm reduces the load on the leeboard and should result in a faster boat. If the skipper falls overboard the boat should rotate into the wind and stall and with luck wait for the skipper. A light weather helm is considered to be ideal.
Now take the case of the builder who modifies the rig so that the sail area centers forward of the leeboard. This might be by changing to a rig style with a jib, or perhaps by relocating the mast forward. Now the two opposing giant fingers on sail and leeboard are not in a vertical line and the boat will want to rotate around the leeboard bow going downwind. To hold the bow on course the skipper must correct by pushing the tiller as in the bottom of Figure 2. This is called "lee helm". Lee helm will increase the reaction load on the leeboard. If the skipper falls overboard the boat will turn downwind and take off without him. Lee helm is usually not considered to be good.
So the way I like to approach it is to keep the center of the sail area directly above the aft half of the leeboard. You might find lots of variations on the rules that hope to provide proper helm feel. Try them if you wish. But keep in mind that if you build the boat and it has lee helm, you need to move the sail area aft. If you have excessive weather helm, the sail area needs to be moved forward.
NOW, BACK TO THE RIGGING DETAILS.....
TYING ON THE SAIL...
I greatly prefer individual ties through the grommets although lacing looks neat. But the individual ties allow for last ditch sail shaping. If you think you needed more round in the head of the sail for example, you could make the ties in the center of the yard tighter than those on the ends. Also, a failure of a tie or two is of little consequence where a failure of a lacing line will be total.
One important note. The ties in the corners take most of the load. They should be tied as shown in the figure in two directions.
HALYARD/YARD ATTACHMENT...
Let's look at the sail and halyard attachment in Figure 1:
As you see, the balanced lug sail pivots around the mast. I guess all sails do. But the balanced lug has the mast running through its middle somewhere, as do other Lugsails, junk sails and lateens. While the mast may interfere somewhat with the aerodynamics of the sail, great benefit is gained in proper "balance" of the sail areas that are in front of the mast. In particular if things are properly placed, the sail will twist less than similar sails that use the mast as a leading edge. As a result the lug is a low tech sail that can be more efficient to windward than you might expect.
One trick to rigging these efficiently is to get the "balance" correct. By my experience the yard should be hoisted about 40% aft on the yard. If you hoist farther forward than that you will get harmful sail twist when sailing to windward. Hoisting too far aft can make the sail uncontrollable. I have often seen in the older literature the advice to hoist at 33% aft. That will work OK but it has been my experience that all the stretches and sags in the system conspire to pull the sail aft with respect to the mast. So if you tie the halyard to the yard at 40%, in use the sail swings aft very close to that 33% value.
(You see the designer has little choice of mast placement once the sail has been chosen. The leeboard can only go at the hulls widest beam. The sail area must center right above it. The mast must cross the yard at a certain point. )
We need to rig the halyard so the sail stays near that 40% position by binding it somehow to the mast. This is especially important while reefed or while in rough water that will force the yard to pump back and forth on the mast. I know of three suggestions.
First for small simple boats that won't be reefed the best solution is to run the halyard through a simple hole in the top of the mast, tie it to the 40% position on the yard, and hoist solidly to the top of the mast. There must be a small amount of slack at the masthead of course to allow the yard to swing but that will appear automatically when you tension the sail with the tack line.
Second you can try the tightening noose system shown in Figure 3. Here the halyard runs in a loose loop around the mast before going to the masthead. It will stay loose until the yard is hauled up all the way. Then additional tension in the halyard constricts the noose (until it hits the stopper knot) and secures the yard to the mast. You will need rollers on the noose to keep the halyard from binding on the mast. I have a feeling that this is the most reliable system.
Third method works well with round and slippery masts. A loose slippery ring is simply dropped over the halyard and mast. I use this system on my Piccup Pram using a section of large PVC pipe as a ring.
THE TACK LINE....
Figure 5 shows the tack arrangement I prefer. As with the yard, the boom must be secured to the mast to prevent pumping in rough water. The actual location of the tack on the yard is not too important. In fact if it were at the very front of the boom you would have a standing lug. The standing lug is probably easier to rig and reef than the balanced lug but in my experience lacks the great manners of the balanced lug in sailing downwind.
The boom has a small cleat on it with a lanyard that wraps around the mast to locate the boom fore and aft. That loop should be fairly loose to allow easy up and down motion of the boom. This loop needs to be set up before the yard is hoisted to prevent the sail from blowing around and making a spectacular and dangerous kite during hoisting.
The actual tack line I prefer is a simple line that runs from the mast step over the boom and down to a cleat at the step. So with the boom loop attached, the yard is hoisted, then the tack line is passed over the boom, pulled very very tight, and cleated. In effect you have now a two to one tackle. All sail tensioning is done with the short and handy tack line and not with the halyard. On my Piccup I run the tack line through a cam cleat to allow for quick adjustment although I don't consider that to be as secure as the good old jamb cleat. In my opinion the tack should always secure to the hull and not to the mast. Securing the tack to the hull will secure the entire mast and rig to the hull in event of a capsize.
Here is some advice about how much to tension the tack line. It varies with wind strength. Look at the sail as you do it. See Figure 6. As you tension the sail with the force of the wind in the sail, stress folds called girts will appear in the sail. If the girt runs from throat to clew you need more tension. If the girt runs from head to tack you either have it right or can reduce the tension. A perfect setting will have no girts. Usually at the initial setup I put in a good girt from peak to tack. Then I watch it while sailing to see if that girt disappears. Then when convenient I trim as required. Remember that changing sailing conditions will change the tension requirements.
THE SHEET...
Nothing fancy needed here. Almost anything will work. Because the sail is balance already to a great degree the sheet forces are less than with other sail types. Because the tack is pulling down in the middle of the boom, the boom has less tendency to lift so downward pull of the sheet on the boom is of less importance. The location and lead directions of the sheet are of little importance also. It's another advantage of the balanced boom. By the was, if the boom is omitted to make the sail boomless, the sheet location is very critical and its needs change all the time. I think the boom is a great invention! The boom on a balanced lug can be quite light and still work.
SAILING ADVICE...
Watch the leading edge of the sail for luffing, as with about any sail. You should be able to tack through about 100 degrees effectively, although if you are really interested in getting somewhere you might sail it more freely, say up to 120 degrees between tacks, especially if the wind is unsteady. While reaching or running a balanced lug sail, even a cheap polytarp one, will keep up with any conventional sail.
Also it should be mentioned that one of the most effective ways to trim the boat, helm-wise, is to rake the mast as required to move the sail are fore or aft. You can see that a small amount of rake will move the mast head quite a bit and the entire sail will go with the masthead. Old time boats had adjustable mast steps or partners. On my designs you can usually shim the mast partner on the bulkhead. It's one place where tinkering pays off. Making a mast a bit longer than shown on the plans is also almost always a good idea as it allows for this tinkering not to mention real life stretch of the rigging.
TOON2
TOON2, CUDDY SAILBOAT, 15' X 5.5', 300 POUNDS EMPTY
Toon2 is in almost every way a multichine version of the AF3. I think these multichine hulls are more like round bilge hulls in that I keep the upper chine above any normal waterline so only the very easy lower chine flows through the water. Other boats shaped this way such and Piccup Pram and Woobo have proven to be very fast and well behaved. Yet they still have a flat center bottom plank that allows you to beach the boat upright.
So one might think that a multichine like this is in every way better than a real flat bottomed boat, but that is not totally true. For one thing multichines have a few more pieces to make and must be assembled with taped seams. Taped seams are light and probably more rot resistant than chine log construction but they can be a bit harder to understand at first glance. And someone building a boat with his children might have second thoughts about the kids messing around with large pots of epoxy. Also the bottom plank of a multichine hull is a lot narrower than that of the equal flattie so floor space is reduced, a real factor if you hope to sleep two on the cabin floor, which you can't do with Toon2.
Toon2 has about the same layout as AF3 but it is about 12" wider and I gave it some bench seats. I'm thinking this will be an excellent solo boat for a short cruise with someone used to tent camping, and yet be a good day sailer for two or three adults, or maybe two adults and two kids. This size boat has always been popular and always will be because it has that sort of capacity and yet can be manhandled by a solo skipper in almost any condition.
The sail rig is the same 96 square foot sharpie sprit that I used on Pencilbox and AF3. It started as the main on my old Bolger Jinni from 20 years ago. Very easy to make and use and efficient if you can live with a 21' mast on a 15' boat.
Toon2 uses taped seam construction with no lofting or ladder building jig required. She needs seven sheets of 1/4" plywood and two sheets of 1/2" plywood.
Prototype plans for Toon2 are $20.
Prototype News
Some of you may know that in addition to the one buck catalog which now contains 20 "done" boats, I offer another catalog of 20 unbuilt prototypes. The buck catalog has on its last page a list and brief description of the boats currently in the Catalog of Prototypes. That catalog also contains some articles that I wrote for Messing About In Boats and Boatbuilder magazines. The Catalog of Prototypes costs $3. The both together amount to 50 pages for $4, an offer you may have seen in Woodenboat ads. Payment must be in US funds. The banks here won't accept anything else. (I've got a little stash of foreign currency that I can admire but not spend.) I'm way too small for credit cards.
I think David Hahn's Out West Picara is the winner of the Picara race. Shown here on its first sail except there was no wind. Hopefully more later. (Not sure if a polytarp sail is suitable for a boat this heavy.
Here is a Musicbox2 I heard about through the grapevine.
This is Ted Arkey's Jukebox2 down in Sydney. Has a temporary rig and he is working on the blueprint rig.
And the Vole in New York is Garth Batista's of www.breakawaybooks.com, printer of my book and Max's book and many other fine sports books. Boat is done, shown here off Cape Cod with mothership Cormorant in background, Garth's girls are one year older. Beautiful job! I think Garth is using a small lug rig for sail, not the sharpie sprit sail shown on the plans, so I will continue to carry the design as a prototype boat.
And the Leinweber's make another prototype! This one by Sandra, an Imresboat shown here on its first outing. They are taking it on a "cruise" so more about it later.
The Mikesboat project has about all its major elements falling into place. He is working outside...
And a new Down Under Blobster, right side up....
AN INDEX OF PAST ISSUES
Hullforms Download (archived copy)
Plyboats Demo Download (archived copy)
Brokeboats (archived copy)
Brian builds Roar2 (archived copy)
Herb builds AF3 (archived copy)
Herb builds RB42 (archived copy)